Weekly check – MaStR Energy Assets

Every Sunday an automated watchdog runs the live actors on Apify with fixed inputs whose correct answers are known, and checks the content of the results — not only whether the run succeeded. The results are published here as they are, failures included.

Last check on 22 Nov 2026: 3 of 3 cases passed. Checked weekly since 22 Nov 2026; each case and its result are listed on this page.

CaseResultTimeWhat is checked
Hydropower units in Bremen from 1,000 kW: the two turbines of the Weserkraftwerk Bremen come back, each once, and nothing else✅ passed3 s
  • at least 2 rows
  • unitName matches ^Weserkraftwerk Bremen Turbine [12]$
  • federalState = Bremen
  • energySource = Wasser
  • grossPowerKw ≥ 1000
  • no duplicate mastrNumber
  • holds for every row
Known unit SEE924412591423 (Turbine 1): 5,000 kW gross, commissioned on 30 November 2011, in operation, in 28207 Bremen✅ passed3 s
  • row with mastrNumber = SEE924412591423
  • unitName = Weserkraftwerk Bremen Turbine 1
  • grossPowerKw = 5000
  • commissionedOn = 2011-11-30
  • status = In Betrieb
  • postalCode = 28207
  • city = Bremen
Each unit names its operator, marked as a company, and the grid operator as the register lists it✅ passed3 s
  • operatorName = Weserkraftwerk Bremen
  • operatorIsCompany is true
  • gridOperator contains “wesernetz Bremen GmbH”
  • gridOperatorCheck = checked
  • dataSource contains “Marktstammdatenregister”
  • holds for every row

Failures and notes from the last check

None — every case gave the known answer.

What this shows: on the day of the check, the live actor gave the known answers for these inputs. It does not prove that every result is correct.

Run on Apify Back to the actor